|
|
|
Older
Homes also need to feel loved so treat your home to a energy
efficient and cost saving Cellulose Insulation. You'll love
the savings as well as the sound proofing affect it will have
over the conventional insulation. |
|
|
 |
|
Our
Process is similar to a new home but the fill process is provided
from the outside of the home by means of locating the right
places to penetrate the exterior wall and then pumping cellulose
insulation into the walls and filling from the bottom up.
|
 |
|
|
Step
1
Locating
the Studs and removing only the necessary exterior wall
"Siding, Shakes, or boards"
|
|
|
|
| |
 |
|
Step
2
Drilling
the necessary fill holes and filling with Cellulose Insulation
from the bottom up or the top down. More than one hole may
be required depending on the framing. By inverting a tube
into the full length of the cavity, non-settling density
is applied to the full cavity.
|
 |
| |
 |
|
Step
3
Holes
are plugged and siding is reinstalled with new nails.
|
Photo
In Process |
| |
 |
|
Step
4
Rim
Joist and attic are done in the same manner as new construction.
Ventilation may need to be upgraded.
Filling
the Attic floor with 15"
(R-50) of Cellulose Insulation
|
 |
 |
| |
 |